17.7 C
Belgrade
27/07/2024
Mining News

Emirates Global Aluminium (EGA) announces near completion of bauxite residue pilot plant in Abu Dhabi

Emirates Global Aluminium (EGA) has announced the anticipated completion of its bauxite residue pilot plant in Al Taweelah, Abu Dhabi, later this year.

The plant, designed with a production capacity of up to 6 tonnes per day, aims to convert bauxite residue, a by-product of alumina refining, into manufactured soil, referred to as ‘Turba’ by EGA, derived from the Arabic word for soil.

Supported by

According to EGA’s website, the Al Taweelah alumina refinery, boasting a 2 million tonnes per year nameplate capacity, processes bauxite into alumina feedstock for aluminium smelters.

The pilot facility is set to facilitate large-scale trials to validate the enhanced plant growth observed during laboratory-scale experiments, while simultaneously reducing water and fertilizer usage. Additionally, preliminary trials suggest that Turba may possess up to ten times the CO2 absorption capacity of natural soil in the UAE.

Given the UAE’s limited natural soil resources, which necessitate significant annual imports for agricultural and greening purposes, the potential of Turba holds promising implications for sustainable land management practices.

EGA’s bauxite residue research team has also explored alternative applications for bauxite residue, including its use as a raw material in the steel, cement, and construction sectors.

With an estimated 150 million tonnes of bauxite residue generated globally each year, waste management remains a critical challenge. EGA’s zero-waste-to-landfill initiative includes repurposing other waste streams such as spent pot lining, utilized by the cement industry as an alternative feedstock and fuel, carbon dust employed in cement manufacturing, and dross processing for aluminum recovery.

Related posts

Serbia and EU revive major lithium project amid green transition efforts

David Lazarevic

Magna Terra Minerals acquires Humber copper-cobalt project in Newfoundland, Canada

David Lazarevic

China and Taliban restart Mes Aynak copper mine project after 16-year delay

David Lazarevic
error: Content is protected !!