- cost overruns
- schedule delays
- performance underachievement
- legal disputes
- insurance claims
- weakened debt-service capacity
- real-time insight
- independent verification
- evidence-based reporting
- structured risk intelligence
- compliance monitoring
- transparency
- Independent from the EPC contractor
- Contractually aligned with the investor/employer
- Technically authoritative
- Embedded in design, procurement, construction, and commissioning
- the engineering assumptions underpinning the financial model
- the actual progress on site
- the quality of installation
- the gaps between design and as-built
- the emerging risks
- the contractor’s hidden problems
- the data the lenders require
- work completed matches contract specifications
- materials installed meet QA/QC requirements
- milestones are genuinely achieved
- no hidden defects jeopardize future performance
- the value earned matches the value claimed
Why this matters to investors:
- prevents overpayment
- eliminates fraudulent progress reporting
- protects against contractor insolvency
- improves cash-flow predictability
- ensures accountability
- validate or reject claims
- evaluate causality
- quantify cost/time impacts
- ensure contractual compliance
- prevent double counting
- ensure correct allocation of risk
- protect the employer from unjustified payouts
- cost escalation
- scope creep
- uncontrolled change orders
- diluted risk allocation under FIDIC/EPC terms
- procurement delays
- manpower shortages
- non-conformities
- HSE deterioration
- undocumented design changes
- interface conflicts
- subcontractor collapse
- erosion of schedule float
- financial risk
- contractual exposure
- potential impact on COD
- risk to debt-service coverage
- adjust contingencies
- enforce covenants
- request corrective action
- hold additional reserves
- prepare refinancing strategy
A. Monthly progress reports
- work executed vs baseline
- schedule variance
- critical path changes
- productivity metrics
- procurement status
- QA/QC performance
- HSE statistics
- ESG compliance status
- photographic documentation
B. Risk dashboards
- probability-impact matrices
- trend analysis
- new/emerging risks
- recommended mitigations
C. Technical due diligence updates
- design completeness
- interface coordination
- contractor performance
- technology risk
D. Disbursement recommendations
- milestone verification
- value-of-work assessment
- corrective actions required
E. Commissioning readiness assessments
- testing procedures
- equipment status
- reliability run status
- performance-guarantee indicators
- technical compliance
- specification adherence
- closure of NCRs
- control of temporary works
- schedule discipline
- assignment of delay responsibility
- verification of performance test results
- enforcement of LDs
- mechanical completion
- electrical and protection integrity
- SCADA integration
- automation functionality
- efficiency and availability metrics
- safety interlocks
- grid compliance
- successful reliability runs
- elimination of punch-list items
- opening the revenue stream
- triggering final disbursement
- releasing EPC bonds
- transitioning to O&M
- operational performance verification
- energy/yield analysis
- efficiency degradation monitoring
- maintenance compliance review
- defect liability oversight
- warranty claims support
- O&M audit
- the financial model
- the asset valuation
- refinancing decisions
- future expansions
- has no commercial interest in the outcome
- is bound contractually to the investor
- has engineering authority
- is present on site regularly
- provides documented, verifiable evidence
- is accountable to lenders
- changes in contractor staff
- developer turnover
- lender rotation
- multiple consultants
- document registers
- design records
- QA/QC logs
- NCR histories
- meeting minutes
- testing data
- risk registers
- commissioning results
- dispute resolution
- insurance claims
- refinancing
- asset sales
- operational optimisation
- transparency
- technical rigour
- independence
- consistency
- evidence
- documentation
- integrity
- the schedule
- the cost forecast
- the risk profile
- the contractor’s performance
- the EPC contract’s enforceability
- the model assumptions
- the project’s bankability
- the investor’s intelligence service
- the lender’s verification arm
- the guardian of contract discipline
- the architect of transparency
- the manager of technical risk
- the certifier of value
- the enforcer of compliance
- the protector of bankability